Post by ALEngineer »

PK-GN5UB cable protectors.

Procedure for removing PK-GN5UB cable protectors during ESP POOH. PK-GN5UB cable-protector layout.

1. Free the Motor Lead Extension (MLE) by backing out screws 5 in turn and removing clamp 3.

2. Back out screws 4 in turn, 1.5 turns each.

3. Remove housing 1 and clamp 2 from the pump section or the protector (seal section).

4. Rebuild the cable protector in the reverse order of steps 1 and 2.
pkgn5ubgsdm.jpg
Original topic (RU)
Инструкция по демонтажу протектолайзеров ПК-ГН5УБ при подъеме насосной установки УЭЦН

1. Освободить кабель-удлинитель, отвернув поочерёдно винты 5 и сняв скобу 3.
2. Вывернуть поочерёдно (по 1,5 оборота) винты 4.
3. Снять корпус 1 и хомут 2 с насосной секции или гидрозащиты.
4. Собрать протектолайзер в обратной последовательности п. 1. и п. 2.