Planned preventive maintenance (PPR) act forms

ESP operations, wellsite supervision, and operator quality reviews of runs, pulls, and shop teardowns. CIS practice often calls those reviews quality days.
Ратейййй
Posts: 21
Joined: Thu Oct 17, 2013 7:32 am

Planned preventive maintenance (PPR) act forms

Post by Ратейййй »

We have a planned preventive maintenance (PPR) act form, but it is outdated - written for KTPPN and SHGS-5805-class VSDs. Anyone have act blanks for newer stations, plus walkaround / inspection forms?
Original topic
Доброго времени суток всем. Тут такой вопрос у нас есть бланк Акта ППР но он устарел так как он делался для КТППН и СУ типа ШГС-5805, может есть в других организациях Бланки Актов под новые СУ. И Акты под обход,осмотр.Заранее спасибо.
ALEngineer
Site Admin
User avatar
Posts: 703
Joined: Wed Mar 18, 2026 2:51 pm

Re: Planned preventive maintenance (PPR) act forms

Post by ALEngineer »

Act blanks (attachments).

Scan / image text translation (original scan kept as attachment below) - walkaround / inspection form:

Report on inspection of surface equipment and ESP operation during a well-stock tour

OGPD (CDNG) - ______ field
Pad ______ Well ______ Date ______ Time ______
ESP ____________ ESP motor ____________
VSD ______ No. ______ SUT ______ No. ______

KSU software version / KI software version

Operating parameters

Code: Select all

+----------+----------+----------+--------+-------+-------+----------+--------+----------+----------+
| U grid   | U rated  | U tap    | F op   | ZP    | ZSP   | I rated  | I op   | Load %   | AR / U   |
+----------+----------+----------+--------+-------+-------+----------+--------+----------+----------+
|          |          |          |        |       |       | 26       | 25     | 96.2%    |          |
+----------+----------+----------+--------+-------+-------+----------+--------+----------+----------+
U grid = supply voltage. U rated = rated voltage. U tap = SUT tap voltage. F op = operating frequency. ZP / ZSP = as labeled on the form. I rated / I op = rated / operating current. AR / U = auto-reclose / voltage.

Well parameters

Code: Select all

+----------+----------+----------+----------+----------+----------+----------+------------+------------+
| Q liq    | P buf    | P ann    | P bh     | T TMS    | P TMS    | H dyn    | Choke OD   | Run hours  |
+----------+----------+----------+----------+----------+----------+----------+------------+------------+
|          |          |          |          |          |          |          |            |            |
+----------+----------+----------+----------+----------+----------+----------+------------+------------+
Q liq = liquid rate. P buf / P ann / P bh = buffer / annulus / bottomhole pressure. T TMS / P TMS = temperature / pressure from the downhole sensor (TMS). H dyn = dynamic level.

ESP run time vs ESP motor load %

Code: Select all

+------------------------+--------------------+
| ESP motor load         | Allowed run time   |
+------------------------+--------------------+
| up to 110% incl.       | 60 min             |
+------------------------+--------------------+
| 120%                   | 10 min             |
+------------------------+--------------------+
| 130%                   | 5 min              |
+------------------------+--------------------+
| 140%                   | 2 min              |
+------------------------+--------------------+
| 150%                   | 1 min              |
+------------------------+--------------------+
| more than 150%         | Stop               |
+------------------------+--------------------+
Mode (highlighted on the scan).

Note (red on the scan): At ESP motor load of 100% and above, take samples and/or request solids-content (KVCh) data.

ID tags present

Code: Select all

+----------+----------+----------------+------------+------------------------------------+
| VSD      | SUT      | Junction box   | Frostok    | Cable run (every 50 m, at turns)   |
+----------+----------+----------------+------------+------------------------------------+
|          |          |                |            |                                    |
+----------+----------+----------------+------------+------------------------------------+
Comments on surface electrical equipment, the surface-equipment pad, cable rack, cable-run lay, presence and grounding of the junction box, comments on ESP operation.

Inspected by: electrician, electrical workshop - _______________
Data received by: technologist, electrical workshop - _______________

* Note: this appendix is valid on the basis of the approved setpoint cards for each customer.
Inspection check.pdf
Work request.pdf
Inspection form.jpg
Preventive maintenance PPR.pdf
Original reply
Бланки актов.
Inspection check.pdf
Work request.pdf
Inspection form.jpg
Preventive maintenance PPR.pdf
You do not have the required permissions to view the files attached to this post.