Assembly of PL-N5 and PL-G5 cable protectors from Bugulma Electric Pump Plant (BENZ) at the ESP motor to protector (seal section) connection.
1. Install the cable protector after the ESP motor to protector flange is joined and the studs are torqued.
2. Set the cable protector on the protector-base neck so the larger body sector sits on the ESP motor housing and the smaller sector sits on the protector housing.
Appearance of a BENZ PL-G5 cable protector.
3. Lock the cable protector on the base neck by tightening the bolt (tightening torque 1.4 kgf*m).
4. Lay the Motor Lead Extension (MLE) in the groove of the cable-protector body, install the cable clamp bar, and tighten the screw (tightening torque 0.7 kgf*m).
Original topic (RU)
Инструкция по монтажу протектолайзеров ПЛ-Г5 на соединение ПЭД (погружного электродвигателя) и гидрозащиты.
- Установку протектолайзера производить после сочленения и протяжки шпилек фланцевого соединения ПЭД и гидрозащиты;
- Установить протектолайзер на шейку основания гидрозащиты таким образом, чтобы больший сектор корпуса протектолайзера находился на корпусе ПЭД, а меньший на корпусе гидрозащиты;
- Зафиксировать протектолайзер на шейке основания, затянув болт (момент затяжки 1,4 кгс*м);
- Уложить кабельный удлинитель в паз корпуса протектолайзера, установить планку крепления кабеля и затянуть винт (момент затяжки 0,7 кгс*м).
- Установку протектолайзера производить после сочленения и протяжки шпилек фланцевого соединения ПЭД и гидрозащиты;
- Установить протектолайзер на шейку основания гидрозащиты таким образом, чтобы больший сектор корпуса протектолайзера находился на корпусе ПЭД, а меньший на корпусе гидрозащиты;
- Зафиксировать протектолайзер на шейке основания, затянув болт (момент затяжки 1,4 кгс*м);
- Уложить кабельный удлинитель в паз корпуса протектолайзера, установить планку крепления кабеля и затянуть винт (момент затяжки 0,7 кгс*м).
Внешний вид протектолайзера ПЛ-Г5 производства ОАО БЭНЗ