Dual completion downhole pumping equipment

Production engineering and artificial-lift methods around ESP wells: field practices and process questions.
Romchik659
User avatar
Posts: 3
Joined: Wed Oct 10, 2018 1:45 am

Dual completion downhole pumping equipment

Post by Romchik659 »

Good day, colleagues.

Who has run dual completion (two reservoirs in one well, produced at the same time, streams kept separate), or whose company already has this downhole pumping equipment in the field? Please share how these units work, the layout types, and the pluses and minuses of this artificial-lift equipment.

Thanks in advance.
Original topic
Добрый день, коллеги.
Подскажите пожалуйста, кто сталкивался с ОРД или у кого в обществе может уже внедрены такие ГНО. Не могли бы Вы поделиться, как работает данные установки, виды установок, а так же плюсы и минусы этого ГНО.
Заранее большое спасибо.
ALEngineer
Site Admin
User avatar
Posts: 579
Joined: Wed Mar 18, 2026 2:51 pm

Re: Dual completion downhole pumping equipment

Post by ALEngineer »

Found this on the web - a lot of useful material in the file.
TPU370645.zip
Original reply
Вот такую вот беду нашел на просторах сети, там много всего умного написано.
TPU370645.zip
You do not have the required permissions to view the files attached to this post.
chernyi-abdulla
User avatar
Posts: 36
Joined: Tue Oct 23, 2018 1:51 pm

Re: Dual completion downhole pumping equipment

Post by chernyi-abdulla »

The topic is fashionable right now, but few people work it in depth. Of the known vendors: Oktyabrsky Packer:
NPF Packer dual completion and dual injection layouts

From the same shop, some theory mixed with marketing: Glavteh: controlled valve for dual completion and dual injection
Glavteh: monitoring dual completion and dual injection systems

If I remember right, a number of these systems ran in Kogalym. Reliability is in question: the downhole unit is already complex, and so is the electronics - downhole monitoring with a controlled electric packer.

Another maker of "intelligent control" for dual completion / dual injection: SibNGS article (field trials)
As that article says, it was tried on Samaraneftegaz fields. Anyone from that area in the loop?
Original reply
Тема нынче модная, но глыбоко и широко занимающихся не много. Из известных - Октябрьский Пакер:
https://npf-paker.ru/catalog/type/komponovki/ore_orz/
Вот от них же немного то ли теории, то ли рекламы: https://glavteh.ru/орэ-управляемый-клапан-орд-орз/
https://glavteh.ru/мониторинг-систем-орэ-орд-орз/
Если не ошибаюсь, то некоторое количество данных систем были в эксплуатации в Когалыме. Надежность данных систем под вопросом, т.к. довольно сложные не только сама установка, но и сопутствующая электронная часть, т.е. телеметрия с управляемым электропакером.
Вот ещё производитель "интеллектуального управления " ОРЭ : http://sib-ngs.ru/journals/article/451#modal_w
как пишут в этой статье, обкатывалась на месторождениях ОАО «Самаранефтегаз». Может из тех краев кто в курсе?